RESPONSIBILITY

A route that can be checked.

Classification, acceptance requirements and records belong in the work, not in an afterthought.

PROJECT NOTES

Each step needs a clear basis.

01

Establish material status

Record usable material, waste and uncertain items separately. Review applicable conditions and recipient authorisation where needed.

02

No automatic acceptance

A website category is not an acceptance authorisation. Describe uncertain, damaged, contaminated or special items before arranging shipment.

03

Keep records of what happened

Record the actual route, responsibilities and handover. A transport receipt does not establish final treatment.

Classification reference

China’s Ministry of Ecology and Environment states that solid waste with uncertain hazardous characteristics must be assessed using the prescribed standards and methods. Appearance or a material label cannot replace that assessment.

Read the ministry source (Chinese) ↗

LET’S TALK

Start with a clear list.

Tell us the material, quantity and condition. Then we can discuss what comes next.

Prepare your brief